The pretreatment of the spraying equipment can not be ignored.

Publish Time: 2018-04-08     Origin: Site

The pretreatment of the spraying equipment can not be ignored. 

  前期工作是何其的重要,任何人在做任何事情的时候,前期的准备工作都是花去很多的时间,但是前期的工作准备好了,为后面的事情做了一个很好的铺垫,那么做起事情就可以是很顺利的完成。那么喷涂设备也是一样,只要前期工作准备完整,在喷涂的过程中,准备充分就会直接影响喷涂的好坏,喷涂设备在正式的工作之前要注意的如下几点:

What is important in the early work, anyone in doing anything, if the early work is done well, then things can be done very smoothly. Then spray equipment is the same, as long as the early preparation is complete, in the process of spraying, the pretreatment will directly affect the quality of powder coating, the powder coating equipment should pay attention to the following points before the formal work:

1、避免产生静电火花,所有无气喷涂设备都应良好的接地。

1, avoid static spark. All airless powder coating equipment should be well grounded.

2、喷涂的涂料要先过滤,滤网应根据涂料的粘度、粒度进行选择。滤网太细涂料不易通过,过粗则喷枪容易被堵塞。

2, the powder should be filtered first, and the filter net should be selected according to the viscosity and particle size of the coating. The filter screen is too thin to pass easily, and the spray gun will be blocked easily if it is too thick.

3、为了减少压缩机造成污染的可能性,空气压缩机应尽可能的远离喷涂现场。

3, in order to reduce the possibility of pollution caused by the compressor, the air compressor should keep away from the spraying site as far as possible.

4、空压出来的压缩空气经过过滤后再进入喷设备,有利于延长气动系的使用寿命。

4, compressed air from compressed air can be filtered into the spray equipment, which will help prolong the service life of pneumatic system.

5、出气管和进气管口经应符合说明书中的规定,以便保持足够的进气量。

5, the outlet and inlet pipe shall conform to the requirements in the instructions, so as to maintain enough intake volume.

6、用户所配空气压缩机的容量应符合说明书的规定的该机空气消耗量,并应尽可能大于消耗量。

6, the capacity of the air compressor that the user should match should conform to the air consumption of the machine specified in the instruction manual, and should consume as much as possible.

因为进行喷涂的工作,不像其他的工作可以进行返工,一旦确定了喷涂的颜色,就只能继续下去。所以前期的工作就一定要十分的注意,才能在后续的工作当中顺风顺水。

Because the work of spraying is not like other jobs, it can be reworked, once the color of the spray is determined, it can only continue. So the early work must be very attention to in the follow-up work well. 


Contact:

Alisa

Tel/Wechat/whatsapp/Skype:13363836725


Contact us

4 roles for powered and free overhead conveyor lines

4 key points you need to know about choosing powder coating equipment

To ensure the safe use of equipment, what are the daily maintenance of the spraying production line

The process of electrostatic spraying equipment measures the pros and cons from five aspects

Introduction of drying room in spraying production line